Building

Corporate – Layher Scaffolding

Layher Scaffolding UK required additional office space and hard standing to store their scaffolding in their Northern Depot. The modular building consisted of four modules with reception area, office space, meeting room, store room, fully integrated kitchen and WC. With a very short turnaround time, the building was delivered in just six weeks with three weeks on-site or groundworks and installation.

We provided a full package including a reinforced concrete hard standing which will be used to store stillage’s for scaffolding, event systems and cladding. Full surface and foul water drainage runs have been fitted and a level access ramp installed to the entrance to provide safe wheelchair access.

Project Date

April 2014

Time on Site

6 weeks

Project Size

120m2

Project Value

£400k

GET IN TOUCH